- Lubricate all moving parts of the machine, sprinkler and sprinkler trolley.
- Check for any water leaks caused by worn seals or materials and eliminate them if necessary.
- Check the efficiency of the turbine.
- Remove at least some of the water inside the polyethylene pipe.
- Set the bypass valves to open and remove the cap from the turbine body to allow the residual water to drain out.
- Check the tyre pressure.
- Check that the control unit and components are in good working order.
Batteries: If the battery is integrated, it can be left installed on the machine during the winter break, but it must be recharged before resuming operation.
To recharge the battery: disconnect the battery from the solar panels (if present) and from the control unit, then remove it from its housing to recharge it.
These are our suggestions for basic maintenance of your irrigation machine. For more information or if you have any questions, please contact us.
